# Ghana: who it owes, who lends, who builds

> Ghana's external debt creditor by creditor and its restructuring after the 2022 default, every lender's loans, aid and projects, the state companies and private producers behind its power plants and gas, its gold and oil, and the Bawku conflict, from the World Bank, the IMF, the OECD, UCDP, Global Energy Monitor and the lenders' own files.

BuildMap · updated 21 Nov 2026 · https://africa.buildmap.org/deep-dives/ghana/

The opening of this page is free; the rest of it, and its data, come with full access: https://africa.buildmap.org/pricing/

Country profile · Ghana

Ghana's government owes USD 26.5 bn abroad to 35 foreign creditors and must pay them USD 23.1 bn, principal and interest, by 2033.

USD 26.5 bn

owed abroad by the state at the end of 2025, 11th of 50 African governments; bondholders hold 34%

USD 23.1 bn

due to its creditors 2026–2033, principal and interest as scheduled; the heaviest in the World Bank's schedule is 2026 (USD 4.6 bn)

USD 2.8 bn

of net aid in 2024 from 72 donors; the largest, IMF Concessional Trust Funds (USD 1.2 bn)

5,944 MW

of power plants operating, beside 300 MW being built (Global Energy Monitor)

Bondholders are the largest creditor. Counting what its companies borrowed, the country owed USD 38.8 bn abroad at the end of 2025, 36% of national income in the World Bank's count; the IMF counts it differently, as the debt section explains. Underneath sit 115 projects in Global Energy Monitor's trackers and 230 lenders' records, and the companies and lenders behind each.

Debt from the World Bank's International Debt Statistics, updated 5 Nov 2026 · aid from the OECD, fetched 19 Nov 2026 · projects from Global Energy Monitor and the lenders' own files, as on the map, built 21 Nov 2026 · register compiled 19 Nov 2026

11th of 50 African governments by what they owe abroad: USD 26.5 bn at the end of 2025, 34% of it to bondholders (World Bank IDS)

## The brief

Ten numbers that sum up Ghana's position: what the state owes and when it must pay, the default and the restructuring, what its gold earns, who gives, and what the power sector costs. Each figure opens the section that explains it.

1. USD 26.5 bnowed abroad by the state at the end of 2025, 11th of 50 African governments in the World Bank's count. It more than doubled in 5 years, from USD 8.0 bn in 2012 to USD 16.4 bn in 2017.
2. 34%of it is owed to bondholders, the largest creditor; the World Bank (IDA) is second with USD 7.0 bn (26%).
3. USD 41.2 bnof debt, at home and abroad, went through the restructuring that followed the default of December 2022; by June 2026 agreements covered 98% of it in the IMF's count, including USD 20.3 billion of domestic debt, USD 13.1 billion of Eurobonds and USD 5.1 billion owed to other states. ([IMF Country Report 26/212](https://www.imf.org/-/media/files/publications/cr/2026/english/1ghaea2026001.pdf))
4. USD 23.1 bndue to creditors from 2026 to 2033, principal and interest as scheduled at the end of 2025; the World Bank's schedule peaks in 2026 at USD 4.6 bn.
5. USD 1.8 bnof external public debt service due in 2026 in the IMF's count, against USD 4.6 bn on the World Bank's schedule. Under the deal with the official creditors, what fell due to them during the IMF programme is repaid 16 and 17 years later, so they are due USD 37 million in 2026 and USD 539 million in 2027. ([IMF Country Report 26/212](https://www.imf.org/-/media/files/publications/cr/2026/english/1ghaea2026001.pdf))
6. 48.8%of GDP: public debt at the end of 2025, from about 93% at the end of 2022; in July 2026 the IMF and the World Bank moved Ghana from high to moderate risk of debt distress, as the IMF's USD 3 billion programme ended. ([IMF Country Report 26/212](https://www.imf.org/-/media/files/publications/cr/2026/english/1ghaea2026001.pdf))
7. USD 31.1 bnof goods exported in 2025, against USD 17.5 bn imported (World Bank). Gold and gems, crude oil, and cocoa made 80% of exports in 2023; Switzerland, UAE and China bought the most (BACI).
8. USD 12 bnof small-scale gold, 88 tonnes, exported by the Ghana Gold Board from January to mid-November 2026, more than the USD 10.2 billion from the large mines, the finance minister told parliament. ([Ministry of Finance](https://www.mofep.gov.gh/sites/default/files/budget-statements/2027-Budget-Speech.pdf))
9. USD 2.8 bnof net aid in 2024; the IMF Concessional Trust Funds gave USD 1.2 bn (41%), the International Development Association USD 843 m.
10. USD 1.4 bnof shortfall in the power sector in 2025, the gap between what it earned and what it cost, in the IMF's count; the state paid independent power producers and fuel suppliers about USD 2 billion, and still owed them USD 1.7 billion at the end of March 2026. ([IMF Country Report 26/212](https://www.imf.org/-/media/files/publications/cr/2026/english/1ghaea2026001.pdf))

Full access

What are the latest trends in Africa?

## The rest of this report comes with full access

The opening is free. Full access adds the nine sections below, and the data behind them.

1. Who builds what, where
2. Seen from space
3. What the state owes, and to whom
4. What it sells and buys
5. Who lends and who gives
6. Who develops the projects
7. Conflict, forces and influence
8. What to watch
9. How this profile was made

[Free in full See a whole report firstThe Grand Ethiopian Renaissance Dam is open to all, every section: the same design and level of detail full access opens here.](https://africa.buildmap.org/deep-dives/gerd/)

Full access is on its way. Join the waitlist and you'll get an email when it opens.

Have full access? [Sign in](https://africa.buildmap.org/signin/?next=/deep-dives/ghana/) to read the rest.

No payment now. The map's power plants, pipelines and submarine cables stay free, and so does the opening of every report and lender profile. [What full access adds](https://africa.buildmap.org/pricing/)