Germany's record is the Federal Ministry for Economic Cooperation and Development's, delivered by KfW and GIZ, and it reports it in full. 28,650 activities with an African recipient for 2018–2024, USD 48.02 bn committed, 291 of them loans, KfW's development loans to the larger economies; 54% of the activities are reported by the Federal Ministry for Economic Cooperation and Development, the rest by the research, foreign and economic affairs ministries and by DEG, the development finance arm. The largest purpose is Formal sector financial intermediaries, USD 4,827 m; Morocco, Tunisia and Egypt receive the most. The ministry's own IATI files are the fuller record of who does the work: 10,384 projects in Africa, EUR 56.0 bn committed since 1990, 2,448 of them running now in 43 countries. KfW carries out 1,722 of them, EUR 29.7 bn, GIZ 1,405, EUR 15.5 bn, and German NGOs, churches, foundations and UN agencies the other 7,257; the main map draws the 1,615 that build infrastructure.
German direct-investment stock in Africa stood at USD 14.7 bn at the end of 2024, South Africa 48% of it, the carmakers' plants; the map's own power layer carries 12 units owned by juwi, ib vogt, BayWa r.e. or Siemens, most of them solar farms in South Africa. What African governments owe German creditors is USD 13,597 m at the end of 2024, Egypt first; USD 9,304 m of it is owed to the German state, mostly KfW's development loans and what survived the debt relief of the 2000s.
OECD CRS activities 2018–2024, DAC2a net ODA 2010–2024 and FDI positions 2015–2024, fetched 14 Oct 2026 · World Bank International Debt Statistics to 2024, release of 3 Dec 2025 · BMZ's IATI files fetched 22 Oct 2026 · Global Energy Monitor as on the map
- 28,650
- aid activities in Africa, 2018–2024: USD 48.02 bn committed, 291 loans
- 2,448
- BMZ projects running now in 43 countries, 389 carried out by GIZ and 779 by KfW; 10,384 on record
- USD 14.7 bn
- German direct-investment stock in Africa at the end of 2024, South Africa 48%, Egypt 11%
- USD 13,597 m
- owed to German creditors by 23 governments at the end of 2024; 12 power units with a German owner, 361 MW operating
Where it is on record
Aid is drawn at each country's interior point, sized by seven years of commitments; the CRS carries no coordinates, so a country point is the honest place. BMZ's projects are a triangle at the same point, sized by the euros the ministry has committed there since 1990: BMZ places every project at the capital, so a country is as precise as its files get. Power units with a German owner sit at Global Energy Monitor's coordinates in the map's status colours. Debt owed to Germany is off until switched on.
The main map's development-finance layer draws BMZ's 1,615 infrastructure projects one by one, inverted triangles at the country's centre, with a button each for GIZ, KfW and the other channels under Germany in its rail.
BMZ commitments per year
EUR million, every sector, by the date of each commitment in BMZ's files, from 2005; the last year runs to the files' date.
Who carries BMZ's projects out
EUR million committed since 1990, with the number of projects: KfW, GIZ, and the other channels together.
BMZ's projects by sector
EUR million with the number of projects, by the CRS sector group of each project's main purpose code.
BMZ's projects by country
EUR million with the number of projects, the twelve largest partners.
BMZ infrastructure on the main map, by sector
USD million with the number of projects, the infrastructure share the map counts, EUR converted at the stated rate.
Aid activities per year
German CRS records with an African recipient, 2018–2024, count.
Aid commitments per year
USD million, current prices, the same records.
Net ODA from Germany to Africa, 2010–2024
USD million, current prices, OECD DAC2a.
German direct-investment stock by country, end 2024
USD million, OECD FDI positions, outward, immediate counterpart.
Where the aid goes, by purpose
Top purpose codes by USD committed, 2018–2024.
Top recipient countries
USD million committed, 2018–2024.
Who reports German aid
Activities 2018–2024 by reporting ministry or agency.
The ministry's own records: GIZ, KfW and the rest
The Federal Ministry for Economic Cooperation and Development (BMZ) publishes every project it pays for to IATI, one file per partner country and per region, and names in each the agency that carries it out. The site reads the 53 African files: 10,384 projects, EUR 56.0 bn committed since 1990, 74% of it paid out; 2,448 are running now. By money energy comes first, EUR 7.8 bn, then government, civil society and peace, EUR 7.6 bn. Morocco has received the most, EUR 4.9 bn over 175 projects, then Egypt and Ethiopia; DR Congo has the most running now, 123.
Three channels carry the money. KfW, the development bank, does financial cooperation, the loans and grants that pay for plants, networks and credit lines: 1,722 projects, EUR 29.7 bn, 779 running. GIZ, the federal agency for international cooperation, does technical cooperation, advisers and training beside the partner ministries: 1,405 projects, EUR 15.5 bn, 389 running. The other 7,257, EUR 10.8 bn, go through German NGOs and church agencies, foundations, Engagement Global and UN agencies such as the World Food Programme. 1,099 regional programmes, EUR 14.5 bn, name a region and no country; they are in the totals, not in the country table or on the maps.
BMZ places every project at the partner country's capital, described as the place of the agreement with the government, never at a site: these records say where Germany works, not where it builds. They are the ministry's own; the CRS below is Germany's whole report to the OECD, BMZ's money among it, and the two are never added.
| Country | Projects | Running | GIZ | KfW | Others | EUR m | Paid out |
|---|---|---|---|---|---|---|---|
| Morocco | 175 | 68 | 62 | 87 | 26 | 4,922 | 74% |
| Egypt | 274 | 85 | 50 | 88 | 136 | 2,765 | 69% |
| Ethiopia | 574 | 123 | 51 | 70 | 453 | 2,327 | 79% |
| Tunisia | 186 | 77 | 61 | 99 | 26 | 2,248 | 67% |
| South Africa | 561 | 121 | 44 | 58 | 459 | 2,097 | 53% |
| DR Congo | 571 | 123 | 45 | 59 | 467 | 1,690 | 82% |
| Kenya | 573 | 121 | 43 | 56 | 474 | 1,546 | 72% |
| Ghana | 281 | 70 | 41 | 55 | 185 | 1,436 | 66% |
| Mozambique | 311 | 71 | 23 | 66 | 222 | 1,256 | 74% |
| Côte d'Ivoire | 92 | 39 | 20 | 39 | 33 | 1,193 | 58% |
| Namibia | 183 | 57 | 39 | 63 | 81 | 1,188 | 73% |
| Senegal | 179 | 52 | 37 | 38 | 104 | 1,174 | 65% |
| Mali | 287 | 54 | 24 | 49 | 214 | 1,085 | 81% |
| Uganda | 414 | 90 | 29 | 40 | 345 | 1,045 | 70% |
| Niger | 122 | 33 | 32 | 28 | 62 | 1,035 | 78% |
| Somalia | 142 | 31 | 26 | 24 | 92 | 994 | 85% |
| Burkina Faso | 320 | 58 | 32 | 55 | 233 | 959 | 78% |
| Zambia | 205 | 67 | 35 | 53 | 117 | 951 | 57% |
| Rwanda | 229 | 58 | 32 | 47 | 150 | 921 | 71% |
| Nigeria | 337 | 67 | 20 | 21 | 296 | 910 | 67% |
| Tanzania | 419 | 82 | 29 | 39 | 351 | 902 | 75% |
| Cameroon | 399 | 86 | 40 | 30 | 329 | 886 | 78% |
| Malawi | 222 | 51 | 25 | 40 | 157 | 873 | 87% |
| Sudan | 92 | 24 | 13 | 26 | 53 | 849 | 83% |
| South Sudan | 236 | 35 | 24 | 14 | 198 | 821 | 87% |
| Benin | 162 | 28 | 27 | 37 | 98 | 761 | 83% |
| Togo | 237 | 61 | 25 | 33 | 179 | 760 | 60% |
| Madagascar | 153 | 46 | 18 | 37 | 98 | 710 | 72% |
| Zimbabwe | 327 | 50 | 18 | 9 | 300 | 417 | 89% |
| Mauritania | 45 | 19 | 28 | 12 | 5 | 384 | 70% |
| Burundi | 142 | 23 | 16 | 17 | 109 | 374 | 87% |
| Chad | 160 | 31 | 11 | 5 | 144 | 371 | 74% |
| Liberia | 121 | 18 | 8 | 15 | 98 | 356 | 95% |
| Sierra Leone | 173 | 40 | 9 | 11 | 153 | 325 | 83% |
| Central African Republic | 47 | 9 | 3 | 11 | 33 | 264 | 93% |
| Libya | 31 | 8 | 17 | 10 | 4 | 250 | 71% |
| Algeria | 33 | 10 | 27 | 1 | 5 | 219 | 63% |
| Guinea | 54 | 11 | 5 | 11 | 38 | 190 | 78% |
| Angola | 100 | 15 | 2 | 0 | 98 | 51 | 88% |
| Lesotho | 27 | 4 | 2 | 2 | 23 | 33 | 98% |
| Eritrea | 17 | 2 | 2 | 0 | 15 | 16 | 87% |
| Botswana | 8 | 0 | 1 | 0 | 7 | 12 | 72% |
| Djibouti | 6 | 0 | 0 | 0 | 6 | 6 | 100% |
| Eswatini | 22 | 5 | 0 | 0 | 22 | 6 | 85% |
| Cabo Verde | 2 | 0 | 0 | 1 | 1 | 5 | 100% |
| Guinea-Bissau | 8 | 0 | 0 | 0 | 8 | 4 | 100% |
| The Gambia | 15 | 2 | 0 | 0 | 15 | 4 | 95% |
| Republic of the Congo | 9 | 0 | 0 | 0 | 9 | 2 | 96% |
| São Tomé and Príncipe | 1 | 0 | 1 | 0 | 0 | 0 | 98% |
| Gabon | 1 | 0 | 0 | 0 | 1 | 0 | 76% |
The largest projects running now
| Start | Where | EUR m | Project · carried out by | Sector | Link |
|---|---|---|---|---|---|
| 2023 | Africa, regional | 635.1 | German Contribution to the 16th Replenishment of the African Development Fund (AfDF 16) Other channels · grant | Other and unallocated | IATI |
| 2018 | Morocco | 600.0 | Solar Complex Noor Midelt KfW Development Bank · loan | Energy | KfW |
| 2020 | Africa, regional | 534.7 | German Contribution to the 15th Replenishment of the African Development Fund (AfDF 15) Other channels · grant | Other and unallocated | IATI |
| 2017 | Africa, regional | 510.4 | German Contribution to the 14th Replenishment of the ADF (AfDF 14) Other channels · grant | Other and unallocated | IATI |
| 2006 | Africa, regional | 509.6 | German Contribution to the Multilateral Debt Relief Initiative (MDRI) of the African Development Fund Other channels · grant | Other and unallocated | IATI |
| 2020 | Morocco | 400.0 | Corona-Soforthilfe in Marokko - Garantiemechanismus zur Abfederung wirtschaftlicher Auswirkungen KfW Development Bank · loan | Banking, business, trade | KfW |
| 2019 | South of Sahara, regional | 289.0 | Central African Forest Initiative (CAFI) Other channels · grant | Agriculture, forestry, fishing | IATI |
| 2020 | Africa, regional | 249.0 | German Paid-in Capital concerning the 7th General Capital Increase of the African Development Bank (GCI 7) Other channels · grant | Other and unallocated | IATI |
| 2020 | Africa, regional | 204.0 | Sustainable Energy Fund for Africa (SEFA) Other channels · grant | Energy | IATI |
| 2026 | South Africa | 200.0 | Support Programme for the Just Energy Transition (JET) KfW Development Bank · loan | Energy | KfW |
| 2025 | Morocco | 200.0 | Climate-relevant financing for Moroccan municipalities - Supporting the mobility transition in Morocco KfW Development Bank · loan | Transport and storage | KfW |
| 2024 | South Africa | 200.0 | Power Sector Reform Programme KfW Development Bank · loan | Energy | KfW |
| 2026 | South Africa | 200.0 | Support Programme for the Just Energy Transition II (JET II) KfW Development Bank · loan | Energy | KfW |
| 2023 | South of Sahara, regional | 170.0 | Regional Resilience Program 2.0 Other channels · grant | Other social services | IATI |
| 2023 | Africa, regional | 167.1 | Keine englische Projektbezeichnung! GIZ · grant | Other social services | GIZ |
| 2024 | South Africa | 150.0 | Renewable Energy and Green Hydrogen Financing Facility (REGHF) KfW Development Bank · loan | Energy | KfW |
| 2025 | Morocco | 150.0 | Programmatic approach - Promoting economic development - economic inclusion, phase II (social protection) KfW Development Bank · loan | Other social services | KfW |
| 2019 | Côte d'Ivoire | 133.0 | Programme de Coopération financière Énergies renouvelables et lefficacité énergétique (investissement) KfW Development Bank · loan | Energy | KfW |
| 2023 | South of Sahara, regional | 130.5 | Regional Resilience Program 2.0 Other channels · grant | Other social services | IATI |
| 2025 | Morocco | 130.0 | Integration of Renewable Energies Program I KfW Development Bank · loan | Energy | KfW |
On the main map: the infrastructure subset
The main map's development-finance layer keeps BMZ's projects in the infrastructure sectors, by the same DAC codes as the African Development Bank, the World Bank and AFD, and counts only the infrastructure share of each project's money: 1,615 projects in 45 countries, EUR 14.7 bn (USD 16.5 bn), 63% paid out. KfW's 580 hold USD 12.9 bn of it, GIZ's 330 USD 3.1 bn and the other channels' 705 USD 0.5 bn; energy comes first, USD 7.6 bn. 6 projects tagged as budget support are left out. Each is an inverted triangle at its country's centre.
| Year | Country | EUR m | Project · carried out by | Sector | Status | Link |
|---|---|---|---|---|---|---|
| 2018 | Morocco | 600.0 | Solar Complex Noor Midelt KfW · loan | Energy | Under construction | KfW |
| 2014 | Morocco | 330.0 | Solarkraftwerk Quarzazate KfW · loan | Energy | KfW | |
| 2024 | South Africa | 200.0 | Power Sector Reform Programme KfW · loan | Energy | Under construction | KfW |
| 2026 | South Africa | 200.0 | Support Programme for the Just Energy Transition (JET) KfW · loan | Energy | Under construction | KfW |
| 2026 | South Africa | 200.0 | Support Programme for the Just Energy Transition II (JET II) KfW · loan | Energy | Under construction | KfW |
| 2025 | Morocco | 160.0 | Climate-relevant financing for Moroccan municipalities - Supporting the mobility transition in Morocco KfW · loan | Transport | Under construction | KfW |
| 2024 | South Africa | 150.0 | Renewable Energy and Green Hydrogen Financing Facility (REGHF) KfW · loan | Energy | Under construction | KfW |
| 2019 | Côte d'Ivoire | 133.0 | Programme de Coopération financière Énergies renouvelables et lefficacité énergétique (investissement) KfW · loan | Energy | Under construction | KfW |
| 2025 | Morocco | 130.0 | Integration of Renewable Energies Program I KfW · loan | Energy | Under construction | KfW |
| 1998 | Egypt | 123.7 | Naga Hammadi Barrage and Power Station KfW · loan | Energy | IATI | |
| 2018 | Morocco | 105.0 | Drinking water supply for small and medium-sized urban centres KfW · loan | Water | Under construction | KfW |
| 2010 | Egypt | 104.0 | Renewable Energies Program - Wind Farm Gulf of el Zayt KfW · loan | Energy | IATI | |
| 2023 | Morocco | 100.0 | Sustainable urban mobility KfW · loan | Transport | Under construction | KfW |
| 2010 | Egypt | 87.5 | Renewable Energies Program - Wind Farm Gulf of el Zayt (ZV) KfW · loan | Energy | IATI | |
| 2003 | Egypt | 86.6 | Aswan High Dam - Rehab. of Generators KfW · loan | Energy | IATI | |
| 2018 | South Africa | 85.5 | Grid Strengthening and Integration of renewable energy II KfW · loan | Energy | Under construction | KfW |
| 2022 | Ghana | 85.0 | Renewable Energy and Energy Efficiency KfW · loan | Energy | Under construction | KfW |
| 2020 | Tunisia | 83.2 | Wasserspeicherung und Hochwasserschutz zur Klimaanpassung im Rahmen von IWRM KfW · loan | Water | Under construction | KfW |
| 2014 | Kenya | 80.0 | Steam Field Development Bogoria-Silali Block KfW · loan | Energy | KfW | |
| 2018 | South Africa | 80.0 | Climate Initiative in Urban Wastewater Management Cape Town KfW · loan | Water | KfW |
Aid activities: OECD Creditor Reporting System
Germany reports to the OECD at activity level, with 12,185 distinct titles for 28,650 records and descriptions that name the partner institution and often the region. The ministry's bilateral programmes are the bulk; the loans are KfW's, to Egypt, Morocco, Tunisia, Kenya and the other economies it lends to on its own terms with a federal subsidy; the research ministry's many small records are university partnerships; DEG's are equity and loans to companies, reported as private-sector instruments.
The purpose codes are the reliable part. The descriptions often name a region or a town (10,746 records mention one), but the CRS carries no coordinates, so the aid is drawn at country points and kept off the project map.
| Year | Recipient | USD m | Purpose | Title · description | CRS id |
|---|---|---|---|---|---|
| 2020 | Morocco | 455.84 | Formal sector financial intermediaries 24030 | Aide d'urgence Corona au Maroc - Mécanisme de garantie pour amortir l'impact économique | 2020148815 |
| 2018 | Morocco | 354.07 | Solar energy for centralised grids 23230 | Complexe Solaire Noor Midelt | 2018131818a |
| 2018 | Morocco | 354.07 | Solar energy for centralised grids 23230 | Complexe Solaire Noor Midelt | 2018131818b |
| 2020 | Morocco | 341.88 | Multisector aid 43010 | Aide d'urgence au Maroc pour atténuer l'épidémie Corona et ses conséquences | 2020148743 |
| 2020 | Morocco | 284.90 | Financial policy and administrative management 24010 | Appui aux réformes du système financier I | 2020144510 |
| 2018 | Egypt | 265.55 | General budget support-related aid 51010 | Budget support for the enhancement of the Egyptian economic reform progr Budget support for the enhancement of the Egyptian economic reform program / Tranche 1 | 2017139007 |
| 2019 | Egypt | 251.88 | General budget support-related aid 51010 | Budget support for the enhancement of the Egyptian economic reform program Budget support for the enhancement of the Egyptian economic reform program / Tranche 2 | 2019140949 |
| 2024 | South Africa | 216.31 | Energy generation, renewable sources - multiple technologies 23210 | Power Sector Reform Programme As part of the FC project, a credit line is being granted to refinance energy projects in the areas of renewable energies (wind and solar), battery storage, transmission and distribution infrastructure and green hydrogen… | 2024145212 |
| 2024 | Africa unspecified | 216.31 | Unallocated / unspecified 998 | 26475467 | |
| 2020 | Tunisia | 170.94 | Financial policy and administrative management 24010 | Programme d'appui aux réformes du secteur public, phase I | 2020144673 |
| 2019 | Sub-Saharan Africa unspecified | 167.92 | Formal sector financial intermediaries 24030 | SME Financing with the Westafrican Development Bank (BOAD) III Small and medium enterprises (SME) Financing with the Westafrican Development Bank (BOAD) III | 2019142541 |
| 2024 | South Africa | 162.23 | Energy generation, renewable sources - multiple technologies 23210 | Renewable Energy and Green Hydrogen Financing Facility (REGHF) This project aims to contribute to the achievement of the programme objectives of assisting South Africa and the region in achieving its Nationally Determined Contributions (NDCs). The project will finance investments in… | 2024150838 |
| 2023 | Namibia | 162.20 | Public finance management (PFM) 15111 | Policy-based Loan to support Namibian government budget and economic recovery The objective of the project is to support the Namibian government in implementing comprehensive structural reforms, particularly in the areas of 'fiscal stability' and 'promoting economic transformation and effective go… | 2023155777 |
| 2020 | Tunisia | 159.54 | Formal sector financial intermediaries 24030 | Programme de prêts des MPME pour la promotion de l'emploi II | 2020136012 |
| 2022 | Morocco | 157.75 | Financial policy and administrative management 24010 | Appui aux réformes du système financier au Maroc II | 2022145198 |
Records that build something
Purpose codes for transport, energy, water and the facility codes of health and education, plus titles that mention building, renovating or drilling: 6,768 records, USD 13,624 m, over the seven years.
| Year | Recipient | USD m | Purpose | Title · description | CRS id |
|---|---|---|---|---|---|
| 2018 | Morocco | 354.07 | Solar energy for centralised grids 23230 | Complexe Solaire Noor Midelt | 2018131818a |
| 2018 | Morocco | 354.07 | Solar energy for centralised grids 23230 | Complexe Solaire Noor Midelt | 2018131818b |
| 2024 | South Africa | 216.31 | Energy generation, renewable sources - multiple technologies 23210 | Power Sector Reform Programme As part of the FC project, a credit line is being granted to refinance energy projects in the areas of renewable energies (wind and solar), battery storage, transmission and distribution infrastructure and green hydrogen… | 2024145212 |
| 2024 | South Africa | 162.23 | Energy generation, renewable sources - multiple technologies 23210 | Renewable Energy and Green Hydrogen Financing Facility (REGHF) This project aims to contribute to the achievement of the programme objectives of assisting South Africa and the region in achieving its Nationally Determined Contributions (NDCs). The project will finance investments in… | 2024150838 |
| 2020 | Tunisia | 126.50 | River basins development 14040 | Programme de stockage de l'eau et de la protection contre les inondation Programme de stockage de l'eau et de la protection contre les inondations dans le cadre d'une GIRE en Tunisie | 2020133574 |
| 2018 | Tunisia | 118.02 | Water sector policy and administrative management 14010 | Prêt à l'appui de réformes au secteur de l'eau | 2017139166 |
| 2018 | Tunisia | 118.02 | Water sector policy and administrative management 14010 | Prêt à l'appui de réformes dans le secteur de l'eau - phase II | 2018141299 |
| 2024 | Egypt | 108.16 | Wind energy 23240 | Long term debt in Wind energy | 2024900813DA1 |
| 2023 | South Africa | 108.13 | Energy policy and administrative management 23110 | Policy Reform Loan to support the Just Energy Transition II The Program supports the GoSA's efforts to advance the restructuring of the power sector to promote long-term energy security and a low carbon transition. The Program builds on recently approved government strategies to … | 2023157095 |
| 2018 | South Africa | 100.87 | Electric power transmission and distribution (centralised grids) 23630 | Renewable Grid Integration and Strenghtening Programme Financing of costs and expenses incurred by Borrower after 1 Jan17 in respect of contracts for works, equipment, consultancy services&other project-related costs for the Renewable Grid Integration... | 2018138963 |
| 2019 | South Africa | 100.23 | Rail transport 21030 | DBSA Refinancing SGR Tanzania Development Bank of Southern Africa (DBSA) Refinancing, Standard Gauge Railway (SGR) Tanzania | 2019145015 |
| 2018 | South Africa | 94.42 | Sanitation - large systems 14022 | Climate Initiative in Urban Wastewater Management Cape Town | 2018137317 |
Power units with a German owner
The map's power layer carries an owner field; this table is those records filtered for a German company. They are the developers' solar farms under South Africa's renewable-energy procurement rounds, juwi's and ib vogt's, with ib vogt's share of a Benban plant in Egypt and a Siemens stake in Nigeria. The map's pipeline and cable layers hold no German owner.
| Asset | Country | Kind | Owners | Status | Detail | Link |
|---|---|---|---|---|---|---|
| Benban BESP 50 solar farm | Egypt | Power unit | BPE Partners; Infinity Energy SAE; ib vogt gmbH | 64 MW, PV, from 2019 | GEM | |
| Benban MMID 30 solar farm | Egypt | Power unit | BPE Partners; Infinity Energy SAE; ib vogt gmbH | 38 MW, PV, from 2019 | GEM | |
| Benban Phoenix 50 solar farm | Egypt | Power unit | BPE Partners; Infinity Energy SAE; ib vogt gmbH | 64 MW, PV, from 2019 | GEM | |
| Benban Taqa solar farm | Egypt | Power unit | Infinity Energy SAE; ib vogt gmbH | 65 MW, PV, from 2019 | GEM | |
| Fekola Gold Mine solar farm | Mali | Power unit | Suntrace; BayWa R.E. AG | 30 MW, PV, from 2021 | GEM | |
| Sirakoro power station | Mali | Power unit | MAN Energy Solutions SE [100%] | 100 MW, internal combustion, from 2023 | GEM | |
| Panyam solar farm | Nigeria | Power unit | Siemens AG; CT Nigeria | Stalled | 70 MW, PV | GEM |
| Grande Côte Mine solar farm | Senegal | Power unit | Juwi Inc | Announced | 20 MW, PV | GEM |
| Free State (JUWI) solar farm | South Africa | Power unit | Juwi Inc | Under construction | 120 MW, PV | GEM |
| Ngonyama solar farm | South Africa | Power unit | ib vogt gmbH | Approved | 140 MW, PV | GEM |
| Paarde Valley PV solar farm | South Africa | Power unit | Juwi Inc | Under construction | 120 MW, PV | GEM |
| Sonvanger PV solar farm | South Africa | Power unit | Juwi Inc; Pele Green Energy | Under construction | 100 MW, PV | GEM |
| SAT-3/WASC | Angola, Benin, Cameroon, Côte d'Ivoire, Gabon, Ghana, Nigeria, Senegal, South Africa | Submarine cable | AT&T, Altice Portugal, Angola Telecom, BICS, BT, Camtel, China Telecom, Chunghwa Telecom, Cogent, Cyta, Deutsche Telekom, Ghana Telecommunications Company, KPN, KT, Liquid Intelligent Technologies, Maroc Telecom, Mauritius Telecom, NATCOM (Nigeria), OPT, Orange, Orange Cote d’Ivoire, PCCW, SBIN (La Société Béninoise d’Infrastructures Numériques), Singtel, Sparkle, Tata Communications, Telecom Namibia, Telekom Malaysia, Telkom South Africa, Telstra, Telxius, Verizon, Vodafone | ready for service 2002, 14,350 km; African landings: Cacuaco, Angola, Cotonou, Benin, Douala, Cameroon, Abidjan, Côte d'Ivoire, Libreville, Gabon, Accra, Ghana, Lagos, Nigeria, Dakar, Senegal, Melkbosstrand, South Africa | – |
Country-year series: investment stock, net aid, debt
Three official series describe German money in Africa one country and one year at a time. The OECD's FDI positions, which for Germany are the Bundesbank's figures, give the outward direct-investment stock by partner country. The DAC2a table gives net ODA by recipient. The World Bank's debt statistics give what each government owes German creditors: KfW's development loans and the older claims that survived the debt relief of the 2000s, and loans from German banks.
Direct-investment stock by partner country
| Partner country | 2015 | 2019 | 2023 | 2024 | Flags |
|---|---|---|---|---|---|
| South Africa | 4,843.8 | 6,635.6 | 7,480.7 | 7,012.3 | |
| Egypt | 1,367.5 | 827.9 | 1,471.8 | 1,686.1 | |
| Morocco | 411.5 | 1,093.0 | 1,384.5 | 1,379.6 | |
| Libya | -57.7 | 51.7 | -48.6 | 955.7 | |
| Algeria | 389.8 | 695.4 | 710.5 | 861.2 | |
| Mauritius | 333.1 | 493.1 | 411.1 | 396.8 | |
| Nigeria | 381.1 | 349.4 | -59.7 | 232.7 | |
| Zimbabwe | 12.0 | 16.9 | 22.1 | 592.1 | |
| Tunisia | 292.9 | 342.6 | 401.1 | 447.8 | |
| Kenya | 205.8 | 284.2 | 103.9 | 231.7 | |
| Côte d'Ivoire | 8.7 | -68.5 | -98.3 | -15.6 | |
| Tanzania | 33.8 | 55.0 | 81.8 | 185.9 | |
| Namibia | 132.8 | 151.7 | 19.9 | 148.6 | |
| DR Congo | – | 129.2 | – | – | |
| Togo | – | – | 0.0 | 103.9 | |
| Ethiopia | 31.6 | 100.0 | 71.8 | 35.3 |
Net ODA by recipient
Over 2010–2024 German net ODA to Africa came to USD 57.88 bn; Morocco received the most.
| Recipient | 2024 | 2010–2024 |
|---|---|---|
| Morocco | 401.31 | 3,370.5 |
| Ethiopia | 227.81 | 2,476.1 |
| Tunisia | 93.17 | 2,444.5 |
| DR Congo | 160.36 | 2,412.8 |
| South Africa | 549.66 | 2,387.6 |
| Cameroon | 117.86 | 1,546.8 |
| Somalia | 105.41 | 1,539.4 |
| Nigeria | 75.12 | 1,537.4 |
| South Sudan | 87.21 | 1,363.5 |
| Kenya | 125.44 | 1,337.0 |
| Ghana | 95.55 | 1,302.3 |
| Mali | 71.22 | 1,199.8 |
| Mozambique | 65.56 | 1,102.1 |
| Sudan | 158.07 | 1,074.2 |
| Niger | 32.62 | 1,066.5 |
| Tanzania | 50.78 | 983.1 |
Debt owed to Germany
| Debtor | Owed, latest | of which bilateral official | Year | Peak stock | Peak year | Largest annual disbursement | Year | New loans since 2000 |
|---|---|---|---|---|---|---|---|---|
| Egypt | 3,691.9 | 3,494.6 | 2024 | 7,049.7 | 2018 | 2,161.4 | 2016 | 19 earlier, then 2019 · USD 405.2 m 2020 · USD 75.7 m 2021 · USD 76.4 m 2022 · USD 79.3 m 2023 · USD 79.3 m 2024 · USD 5.0 m |
| Morocco | 2,666.8 | 2,663.3 | 2024 | 2,666.8 | 2024 | 592.8 | 2024 | 14 earlier, then 2018 · USD 491.4 m 2019 · USD 62.1 m 2020 · USD 1,255.6 m 2022 · USD 247.8 m 2023 · USD 324.4 m 2024 · USD 500.0 m |
| Ghana | 1,086.7 | 300.6 | 2024 | 1,086.7 | 2024 | 602.0 | 2021 | 16 earlier, then 2018 · USD 95.4 m 2019 · USD 306.2 m 2020 · USD 253.6 m 2021 · USD 925.5 m 2022 · USD 175.5 m 2023 · USD 12.4 m |
| Tunisia | 1,073.4 | 1,049.5 | 2024 | 1,133.9 | 2023 | 307.8 | 2019 | 14 earlier, then 2018 · USD 308.9 m 2019 · USD 118.5 m 2020 · USD 620.4 m 2021 · USD 43.4 m 2022 · USD 105.7 m 2023 · USD 37.8 m |
| South Africa | 967.5 | 655.8 | 2024 | 967.5 | 2024 | 541.1 | 2024 | 3 earlier, then 2004 · USD 18.1 m 2007 · USD 17.2 m 2015 · USD 310.0 m 2018 · USD 100.0 m 2023 · USD 541.3 m 2024 · USD 541.1 m |
| Benin | 691.9 | – | 2024 | 711.2 | 2023 | 638.6 | 2023 | 2018 · USD 413.4 m 2021 · USD 161.1 m 2022 · USD 69.1 m 2023 · USD 378.5 m |
| Côte d'Ivoire | 679.7 | 224.5 | 2024 | 679.7 | 2024 | 271.0 | 2020 | 6 earlier, then 2019 · USD 74.0 m 2020 · USD 549.5 m 2021 · USD 178.3 m 2022 · USD 490.6 m 2023 · USD 242.1 m 2024 · USD 165.6 m |
| Angola | 656.7 | – | 2024 | 656.7 | 2024 | 332.4 | 2023 | 1 earlier, then 2004 · USD 248.7 m 2016 · USD 81.7 m 2018 · USD 126.2 m 2020 · USD 384.9 m 2022 · USD 305.0 m 2023 · USD 453.8 m |
| Tanzania | 544.3 | – | 2024 | 578.9 | 2023 | 559.1 | 2023 | 2023 · USD 771.2 m |
| Zimbabwe | 392.7 | 279.6 | 2024 | 544.4 | 2007 | 49.6 | 1999 | 2000 · USD 2.6 m 2002 · USD 1.2 m 2003 · USD 12.1 m |
| Kenya | 363.2 | 330.9 | 2024 | 440.8 | 2021 | 93.0 | 2016 | 10 earlier, then 2015 · USD 59.4 m 2017 · USD 370.3 m 2018 · USD 9.5 m 2019 · USD 45.9 m 2020 · USD 43.1 m 2022 · USD 99.4 m |
| Senegal | 265.4 | 75.6 | 2024 | 265.4 | 2024 | 136.3 | 2023 | 2001 · USD 10.5 m 2004 · USD 0.0 m 2018 · USD 154.4 m 2023 · USD 498.9 m |
| Republic of the Congo | 165.3 | 165.3 | 2009 | 188.7 | 2007 | 25.9 | 1985 | none |
| Nigeria | 160.7 | 105.8 | 2024 | 4,769.6 | 2004 | 424.0 | 1982 | 2013 · USD 13.9 m 2014 · USD 200.0 m 2022 · USD 63.6 m |
| Niger | 148.5 | – | 2024 | 219.3 | 2020 | 204.0 | 2020 | 2020 · USD 256.8 m |
| Cameroon | 95.6 | 22.6 | 2024 | 1,838.6 | 2004 | 176.1 | 1988 | 5 earlier, then 2008 · USD 1.7 m 2013 · USD 7.3 m 2015 · USD 56.7 m 2017 · USD 54.5 m 2018 · USD 74.7 m 2020 · USD 58.2 m |
| Sudan | 67.7 | 67.7 | 2024 | 126.3 | 2007 | 49.2 | 1975 | none |
| Somalia | 38.1 | 38.1 | 1978 | 38.1 | 1978 | 14.1 | 1978 | none |
| Uganda | 28.5 | 21.7 | 2024 | 58.8 | 1978 | 24.6 | 1978 | 2013 · USD 19.9 m 2016 · USD 56.2 m 2018 · USD 41.3 m 2019 · USD 44.8 m |
| Zambia | 22.7 | 22.7 | 2005 | 593.6 | 1995 | 162.1 | 1980 | none |
| Togo | 18.1 | 18.1 | 2009 | 179.3 | 1979 | 50.8 | 1978 | none |
| Sierra Leone | 10.0 | 10.0 | 2006 | 59.4 | 1982 | 11.1 | 1980 | none |
| Ethiopia | 8.6 | 8.6 | 2024 | 141.2 | 1991 | 36.2 | 2016 | 2015 · USD 36.4 m |
| São Tomé and Príncipe | 5.9 | 5.9 | 2006 | 12.8 | 1990 | – | – | none |
| Liberia | 5.5 | 5.5 | 2009 | 144.3 | 2007 | 11.8 | 1983 | none |
| Botswana | 5.5 | 0.1 | 2000 | 33.3 | 1994 | 30.3 | 1993 | none |
| Guinea | 4.2 | 4.2 | 2011 | 51.2 | 1979 | 15.5 | 1979 | none |
| Central African Republic | 3.9 | 3.9 | 2008 | 15.9 | 1977 | 2.0 | 1976 | none |
| Madagascar | 3.3 | – | 2024 | 169.4 | 1987 | 58.0 | 2017 | 2017 · USD 58.0 m 2018 · USD 40.0 m |
| Djibouti | 2.0 | – | 2014 | 7.9 | 2009 | 1.4 | 1983 | none |
| Eswatini | 1.9 | 1.9 | 2024 | 69.9 | 1995 | 22.5 | 1978 | none |
| Mauritania | 1.8 | 1.8 | 2024 | 155.6 | 2012 | 80.5 | 2012 | 2009 · USD 239.4 m 2012 · USD 7.0 m |
| Cabo Verde | 1.3 | 1.3 | 2010 | 12.1 | 1999 | 12.8 | 1999 | none |
| Mali | 0.8 | – | 1993 | 66.8 | 1978 | 11.2 | 1976 | none |
| Guinea-Bissau | 0.7 | 0.7 | 2010 | 3.2 | 1990 | 0.3 | 1987 | none |
| Burundi | 0.7 | – | 2007 | 9.9 | 1979 | 3.5 | 1978 | none |
| Gabon | 0.7 | – | 2019 | 406.6 | 1994 | 41.3 | 2006 | 2004 · USD 108.2 m 2009 · USD 12.7 m 2010 · USD 113.5 m |
| Lesotho | 0.6 | – | 2007 | 9.6 | 1998 | 5.3 | 1996 | none |
| Rwanda | 0.4 | – | 1989 | 14.8 | 1978 | 9.1 | 1984 | none |
| Chad | 0.3 | 0.3 | 2014 | 8.6 | 1979 | 2.9 | 1987 | none |
| The Gambia | 0.3 | 0.3 | 1996 | 7.0 | 1987 | 3.2 | 1981 | none |
| Burkina Faso | 0.2 | 0.2 | 2003 | 38.6 | 1978 | 7.8 | 1976 | 2021 · USD 95.5 m |
| Malawi | 0.2 | 0.2 | 2005 | 39.1 | 1978 | 12.5 | 1975 | none |
| Mozambique | 0.1 | 0.1 | 2003 | 320.9 | 1994 | 25.2 | 1987 | none |
| Algeria | 0.0 | 0.0 | 2024 | 1,837.6 | 1995 | 741.0 | 1990 | 2000 · USD 151.6 m 2001 · USD 51.3 m 2002 · USD 51.2 m 2003 · USD 36.2 m 2004 · USD 20.4 m 2006 · USD 0.1 m |
| DR Congo | 0.0 | 0.0 | 2016 | 701.6 | 1987 | 92.3 | 1981 | none |
| Mauritius | 0.0 | 0.0 | 2024 | 48.3 | 1990 | 24.4 | 1990 | 2006 · USD 4.3 m |
World Bank International Debt Statistics, counterpart 005: all public and publicly guaranteed debt to creditors there, the state and its banks together (series DPPG, as on the debt page), with the bilateral official part beside it. Sovereign and sovereign-guaranteed borrowing only; DEG's lending to companies and Hermes-covered export credits to private borrowers are outside the series.
How to read this page
- One record is
- In the BMZ tables, one BMZ project as the ministry publishes it, under the agency that carries it out; a triangle on the profile map is a country's projects together. In the aid tables, one CRS activity as Germany reports it. In the energy table, one GEM power unit, as the map carries it. In the series, one country and one year.
- Status
- BMZ projects carry IATI's status: 2 is running now (under construction on the main map), 3 and 4 finished. GEM records use the map's own mapping. Aid activities have no status.
- Money
- CRS commitments and disbursements are in current US dollars as reported. Net ODA is current prices. FDI stock is the OECD's net position, all resident units, immediate counterpart. Debt is the World Bank's public and publicly guaranteed stock owed to the lender's creditors, the state and its banks together, as the debt page counts it, with the bilateral official part, the state's own claims, beside it. None of these is a project value and none is added to the map's lenders. BMZ's commitments are in euros as it publishes them, from IATI commitment transactions; paid out is KfW's disbursements and GIZ's and the other channels' expenditure. The main map converts them to dollars at its stated rate and counts only the infrastructure share; neither is added to the CRS dollars.
- Location
- Aid, BMZ's projects and the three series are drawn at the country's interior point; BMZ gives every project the capital's point, the place of the agreement. Power units carry GEM's coordinates.
- Not here, and why
-
- GIZ's own IATI file holds only the work other clients commission from it (the European Commission, the UK, the Netherlands), with no locations; GIZ's work for BMZ is in BMZ's files, read above. BMZ publishes no country file for Comoros, Equatorial Guinea, Mauritius or Seychelles, and gives no project a site.
- DEG's portfolio is published as a list of companies and countries without amounts per investment; Hermes export-credit guarantees have no project register.
- The federal government's Compact with Africa and its Africa strategy are policy documents, not datasets.
- Sources and licences
-
- OECD, Creditor Reporting System, Germany as provider (DAC code 5), activity-level microdata through the SDMX API, one year at a time; OECD terms of use, free reuse with attribution. OECD, DAC2a, net ODA by recipient (measure 206), current prices. OECD, FDI positions by partner country (BMD4), Germany outward.
- Federal Ministry for Economic Cooperation and Development (BMZ), IATI 2.03 activity files, 53 African country and regional files through the IATI Registry (publisher bmz, DE-1), generated 30 Sep 2026; CC BY per the Registry.
- World Bank, International Debt Statistics, source 6, counterpart area 005; CC BY 4.0, release of 3 Dec 2025.
- Global Energy Monitor, Global Integrated Power Tracker, as the map draws it; CC BY 4.0.
- Download
- Everything on this page, with BMZ's aggregates by channel, country, sector and year and its largest running projects, the aid aggregates by country, year, purpose and agency, the three series per country and the filtered power units: germany.json.